Projects

Upper Radhi Small Hydropower project (URSHP) is a run of the river hydroelectric power generation plant with an installed capacity of 4.4MW which generated 25.02 GWh of energy annually. The Upper Radhi Small Hydropower Project lies in Lamjung district of western development region of Nepal. Radhi Khola is one of the tributaries of Marsyandi River which itself is tributary of Gandaki River, one among the three river basin of Nepal. The project area has no vehicular access. But there is a seasonal vehicular access upto Shreechaur. The total road distance from Kathmandu to project site is about 200km.The Project is under construction and estimated to be completed within 2 years time.

Detail Technical Description of the Plant

Descriptions Parameters
Project nameUpper Radhi Small Hydropower Project (URSHP)
Location
Longitude84024’34”E and 84027’00”E
Lattitude28023’48”N and 28024’55”N
DistrictLamjung
Type of power plant
Type Run-of- river
Hydrology  
Catchments area at intake site17.0 km2
Long term annual average flow1.06 m3/s
Average minimum flow0.38 m3/s
Design flood at intake (1 in 100 Years)67.0 m3/s
General hydraulics  
Gross head 617.00 m
Net head596.60 m
Design flow0.87 m3/s
Capacity4.40 MW
Diversion weir  
TypePermanent type, boulder lining with cut-off wall
Length8.70 m
Height 1.4 m above river bed
Crest elevation1722.00 masl
Intake chamber  
TypeOrifice type side intake
Size of opening 1.5 x 0.5 m (2 Nos.)
Bed Load Flushing Arrangement  
Bed load sluice 2.24 m wide and 1.5m high sliding gate )
Gravel trap  
Gravel trap width3.3 m
Gravel trap length3.3 m
Coarse trash rack 3.7 m x 1.3 m
Settling basin  
No of bays2 nos.
Nominal size of trapped particle0.15 mm
Trap efficiency 90%
Length  
Inlet transition7.28 m
Uniform section32.0 m
Width 
Uniform section3.0 m each
Depth  
Total depth including hopper2.1 m
Overhead river crossing  
TypeSteel truss bridge
Length30.0 m
Width1.0 m
Height1.0 m
Headrace pipe  
TypeExposed
Diameter 0.60 m mild steel pipe
Length 541.0 m
Thickness8 mm
Surge pipe and tank  
TypeSurface
Internal pipe diameter1.75 m
Tank diameter2.5 m
Penstock
Material  
 
TypeMild Steel (IS 2062), Exposed
Diameter 0.60 m mild steel pipe
Length 1314.0 m
Thickness8 mm to 32 mm
Powerhouse  
Type Surface
Size 30.0 m long, 12.0 m wide and 9.0 m high
Tailrace canal  
Shape Rectangular
Length 45.0 m
Cross-section area3.0 m2 (2.0 m wide x 1.5 m high)
Turbines  
Type Pelton
No. of jets2
AlignmentHorizontal shaft
Rated net head596.60 m
Rated discharge0.87 m3/s
Turbine rated output (power on shaft)2500 kW x 2
Turbine efficiency90 %
No of units2 Nos.
Speed1000 rpm
Axis level1105.0 masl
Generators  
TypeSynchronous 3 phase
Output2 X 2500 KVA
Rated Voltage3.3 KV
Insulation ClassF
Power factor0.80
Rated speed1000 rpm
Frequency50 Hz
ExcitationSelf excited
Transmission line  
Length 3.0 km, interconnected at proposed Substation in Ghermu Phat
Voltage 33 kV
Transformer  
Type of coolingONAN
Tap changing facility±2.5X2
TypeThree phase
Rating5.0 MVA
vector groupYnd11
Power factor0.8
Voltage ratio3.3 / 33 KV
Frequency50 Hz
Energy generation  
Mean annual estimated energy per year25.62 GWh
Dry energy 5.09 GWh
Wet energy 20.53 GWh
Construction Period2 Years
Financial Indicators (based on 2008 July price level, economical life = 25 years)
Project cost including transmission line and access road( after financing)NRs 593.201 million
Cost per kW ( after financing)NRs. 134,818.00
Financial Net present value (NPV)NRs 290.30 million
Financial Internal Rate of Return (FIRR)21.34%
Financial B/C ratio at discount rate of 10%3.11